Nuclear power plant Areva Avogardo

In November 2016, Mit nucleare assigned us periodic verification of the crane’s hoist and its lifting accessories in the Avogardo nuclear power plant.

We performed a test of the lifting equipment assembly and carried out the crane’s static load tests.

Lascia un commento

Il tuo indirizzo email non sarà pubblicato. I campi obbligatori sono contrassegnati *