In January 2017, we were contacted by SIA in order to perform maintenance work on automation and electrical systems on their boats.
Nuclear power plant Areva Avogardo
In November 2016, Mit nucleare assigned us periodic verification of the crane’s hoist and its lifting accessories in the Avogardo nuclear power plant.
We performed a test of the lifting equipment assembly and carried out the crane’s static load tests.
Elettra Sincrotrone Lifting crane maintenance
In August 2016, Elettra Sincrotrone assigned us the maintenance contract for the lifting equipment.
We performed a general analysis of the lifting equipments present in the plant, after that we suggested all the urgent interventions to make and finally agreed on a schedule for the ordinary maintenance.
Beaumont Monteux Dam
The ITS studio performed the floodgate’s adjusments and commissioning
In July 2016, ATB Riva Calzoni appointed us in order to follow the Beaumont Monteux Dam’s commissioning.
Segment Lifter
DEAL Segment Lifter for the Hong Kong Zhuney Macau Bridge.
In April 2016, we obtained the order for the mechanical electrical design and automation of a segment lifter for Deal.
In close collaboration with Deal’s technical department, we have developed the lifting equipment and the entire electrical and automation system of the machine.
We provided Deal with the risk analysis, the electrical and mechanical design and the use and maintenance manuals.
krško motorized dogging system project
Atb Riva Calzoni krško motorized dogging system project
In February 2016, ATB Riva Calzoni appointed us with the design of a new automatic opening system for the Krško nuclear power plant dam.
We performed the on-site surveys and developed the best solution based on customer needs.
After ATB approved the project, we supplied the designed components.